Month: April 2016

Do you know how to determine the risk rankings for your high energy piping systems?

Do you know how to determine the risk rankings for your high energy piping systems? Do you want to take a sneak peak into our Risk Matrix? Listen in on this presentation and learn the secrets that go into determining the risk for your High Energy Piping Systems. This is well worth your time!!!! Click

Continue reading

Are Asset Management Programs Right For You?

Wondering if an asset management program is right for you? Check out this short video for an introduction to what 4-SYTE has to offer and why it’s being used by over 70 Utilities across America today.  It could be the most important 5 MINUTES you’ll spend. If you would like to learn more, click below to register to

Continue reading

CYCLING OPERATIONS RESULTS IN STEAM CHEST REPAIR

Recently, Thielsch Engineering was contracted to provide engineering supervision and perform repairs by welding on the main steam control valve chest at a 500 MW facility located in Texas, thus returning it to a level of integrity suitable for continued service under the design operating conditions.  The mid 70’s vintage unit had experienced significant thermal

Continue reading

THIELSCH ENGINEERING AWARDED MULTI-YEAR CONTRACT WITH CITY OF AUSTIN: AUSTIN ENERGY

Thielsch Engineering, Inc. is pleased to announce it has been awarded a multi-year contract with Austin Energy and The City of Austin. The 6-year contract covers Power Plant and Chiller Maintenance and totals $16 million in estimated expenditures. Thielsch is proud to be a part of the team playing a role in Austin Energy’s mission

Continue reading